077 Case Studies in Technology Applications
Tuesday, 13 February
Room 4
Technical
-
1600-1620 24336Successful Utilization Of Managed Pressure Cementing During Running And Cementing 7 Inch Liner Through Rotating Control Device In A Narrow Mud Weight Window For An Unconventional Well
-
1620-1640 24305Driving Operational Excellence: Cost Savings And Performance Optimization Through Tripping And Connection Time Optimization
-
1640-1700 24295A Graphical User Interface For Hard Rock Drilling Optimization
-
1700-1720 24331Advanced Technology Upgrades In Downhole Torsional Dysfunctions Mitigation To Improve Rotary Steerable System (RSS) Reliability
-
Alternate 24312Designing Shaped Charges For Optimized Performance In Reservoir Rock
-
Alternate 24329Novel 15,000 Psi, 350°F Rated Dissolvable Frac Plug With Metal Sealing Element Used In Saudi Arabia, South Ghawar To Improve Well Economics
-
Alternate 24267A Comprehensive Overview On Inefficient Events And Key Technologies Of Multi-branched Well Drilling And Completion In Saudi Region
-
Alternate 24288Standardizing Drilling Fluids Practices Has Reduced Stuck Pipe Non-productive Time During Drilling Through Fractured Dolomite Formation Under Complete Loss Circulation - Case Study (kuwait)
-
Alternate 24366Breaking New Ground: Exploring The Connection Between Drilling Parameters And Formation Properties Through Advanced Multi-source Data Pattern Analysis
-
Alternate 24363Using Dynamic Event Modeling Software As An Effective Risk Mitigation Tool For Perforating Operations