Skip to main content

IPTC LogoPTTEP

1–3 March 2023
Bangkok, Thailand

2024 Technical Program

Subpage Hero

Loading

002 Completions — Case Studies

Monday, 12 February
Room 2
Technical
  • 1400-1420 23761
    Utilization Of Compact Unitized Wellhead System For Unconventional Wells
    M. Al Amer, Saudi Aramco D&WO; M.E. Mukhlifi, Saudi Aramco; M. Alsaeed, Saudi Aramco D&WO
  • 1420-1440 23749
    Dissolvable Ball As A Temporary Fluid Loss Control Device For Multilateral Wells
    I. El Mallawany, Halliburton Saudi Arabia; Y. Simmons, Halliburton A/S; A. Mohamed, A. Osman, Halliburton Saudi Arabia
  • 1440-1500 23774
    Completion Philosophy Rejuvenation To Maximize The Well Potential In Challenging Sour Hpht North Kuwait Jurassic Gas Fields
    M. Abdel-Basset, SLB; M. Al-Sharad, M. Al-Arrouj, A.A. Alqallaf, T. Bloushi, M. Al-Mutawa, M. Al-ajmi, Kuwait Oil Company
  • 1500-1520 23758
    Optimizing Wellbore Cleaning Operations In High Hd-to-tvd Ratio Wells: Insights From Case Studies In Challenging Well Profiles
    O. Olabintan, Samaa Technologies Co Ltd
  • Alternate 23771
    Exploring CCUS Well Construction Using Fit-for-purpose Cement Designs
    J. Shine, Saudi Aramco; U. Qasmi, Schlumberger
  • Alternate 23812
    A Holistic Approach For Developing A Wellhead Materials Standard
    M. Muqri, Saudi Aramco D&WO; M.E. Mukhlifi, Saudi Aramco; M. Al Amer, Saudi Aramco D&WO
  • Alternate 23787
    Milling With Zero Stalls Intelligent Coiled Tubing System Optimizes Ball And Baffle Milling Operationin In Shut-in Conditions
    P. Correa, Baker Hughes

Our Sponsors