002 Completions — Case Studies
Monday, 12 February
Room 2
Technical
-
1400-1420 23761Utilization Of Compact Unitized Wellhead System For Unconventional Wells
-
1420-1440 23749Dissolvable Ball As A Temporary Fluid Loss Control Device For Multilateral Wells
-
1440-1500 23774Completion Philosophy Rejuvenation To Maximize The Well Potential In Challenging Sour Hpht North Kuwait Jurassic Gas Fields
-
1500-1520 23758Optimizing Wellbore Cleaning Operations In High Hd-to-tvd Ratio Wells: Insights From Case Studies In Challenging Well Profiles
-
Alternate 23771Exploring CCUS Well Construction Using Fit-for-purpose Cement Designs
-
Alternate 23812A Holistic Approach For Developing A Wellhead Materials Standard
-
Alternate 23787Milling With Zero Stalls Intelligent Coiled Tubing System Optimizes Ball And Baffle Milling Operationin In Shut-in Conditions