047 Delivering Complex Wells
Tuesday, 13 February
Room 3
Technical
-
1100-1120 24120The Benefit Of In-bit Sensing For Efficient Drilling Of Deep Reach Lateral Wells In Hfto Prone Interbedded Abrasive Lithologies In North America Land
-
1120-1140 24219Torque Reduction Tools In Long ERD Wells
-
1140-1200 24236Performance Analogy By Torque Reduction, Casing Wear And Drilling Performance Of Non-rotating Drill Pipe Protectors Made Of Steel And Material Of Low Friction Coefficient In Multilateral Wells
-
1200-1220 24156Delivering Value Using Existing Well Via Extended Reach Drilling For Exploration In A Tough Cost Environment.
-
Alternate 24159Automation And Standardization To Accelerate Well Delivery In A Complex Field Development
-
Alternate 24110Integrated Engineering Approach To Drill A Complex Horizontal Well With Stringent Requirements Dictated: A Case Study From Offshore North-west Java, Indonesia
-
Alternate 24198Abandonment Of A Well Located In A High Torrent River Under-river Project Using An HWO Unit In Colombia
-
Alternate 24167Drilling Beyond The Boundaries Of Complex Extended Reach Well In Al Nouf Field, Abu Dhabi, Uae
-
Alternate 24074Methodology For The Analysis Of Thermally Induced Fluid Expansion In Complex Wellbore Structures Using Hydrostatic Fluid Elements Within A Finite Element Study
-
Alternate 24237Real Time Optimization Of Drilling Parameters During Drilling Operations