034 Stuck Pipe Prevention
Tuesday, 13 February
Room 4
Technical
-
0900-0920 24071Experimental Design To Study On Releasing Of A Stuck Pipe Utilizing BHA Whirling
-
0920-0940 24215Rheoprofiler Rheometer: Real Ttime Mud Properties That Improve The Software Algorithm
-
0940-1000 24216Case Studies of a Novel Digital Twin System for Real-time Early Identification and Warning of Pipe Stuck
-
1000-1020 24141Prevention Of Stuck Pipe Events And Robust Real-time Identification Of Root Cause Using Physics Based Models In Combination With Bayesian Network Models
-
Alternate 24098Impact Of New Wireline Logging Technology In Determining The Free Pipe Depth In A Range Of Bottom Hole Assemblies And Conditions
-
Alternate 24177Overcoming Formation Stability Risks And Optimizing Drilling Time Using Continuous Circulation System For The First Time In The Colombian Foothills
-
Alternate 24081Utilizing Mpd Technology To Minimize Stuck-pipe Risk At First And In Case Stuck-pipe Encountered, Mpd Assists In Freeing Process Hence Improving The Chances
-
Alternate 24078Stuckpipe Prediction Model To Detect And Notify Rig Crew Based On Rock Properties, Drilling Parameters And Cuttings Analysis
-
Alternate 24182A New Approach To Differential Sticking
-
Alternate 24190Flax Seed Mucilage As Green Inhibitor In Water-based Drilling Fluid To Modify The Rheological And Filtration Properties And Mitigating Shale Swelling Characteristics.
-
Alternate 24199Improving Well Productivity Through Better Perforation Design