075 Well Interventions and Abandonment
Tuesday, 13 February
Room 2
Technical
-
1600-1620 24335Cement Slurry Plug With Dedicated Properties Success To Cure Losses And Stop Gas Kick In Deep Water Exploratory Well In Mediterranean Sea
-
1620-1640 24364Increasing Accessibility On Multilateral Extended Reach Intervention
-
1640-1700 24326Integrated Solution For Development Carbonate Reservoir: Challenges And Mitigation In A Workover Operation
-
1700-1720 24269Real-time Hybrid Coiled Tubing Intervention Used To Complete The Longest Ever-recorded Cement Millout Operation: 4,000 Meters Of Cement Successfully Milled In Oman While Reducing Waste To Optimize Intervention Costs & Time By 70%.
-
Alternate 24281A Novel Flow Profile Study : Dynamic - Transient Acoustic Pressure Thermal Logging Through Injection To Increase The Effectiveness Of Water Shutoff Operation In Depleted Production Wells
-
Alternate 24300The Role Of Controlling Drilling-induced Vibrations On Rop Optimization- A Literature Review
-
Alternate 24365Designing Matrix Acidizing Treatments With Particulate Diverters - Part I: Model And Predictions
-
Alternate 24291Utilizing Lessons Learned From Overcoming Challenges To Achieve Continuous Improvement In Rigless Plug And Abandonment In Southern Region Of Pakistan: Case Studies
-
Alternate 24330Deployment Of Customized Multi-purpose Offshore Vessel With Dynamic Positioning Capabilities In Large Scale Well Intervention Operations
-
Alternate 24275Experimental Measurement Of Gas Bubble Flow Through Wet Microannuli
-
Alternate 24325Applicability Of Well Abandonment With Rigless Coil Tubing Over Drilling Rig In Deep Remote Location