Skip to main content

IPTC LogoPTTEP

1–3 March 2023
Bangkok, Thailand

2024 Technical Program

Subpage Hero

Loading

061 Well Planning Optimisation

Tuesday, 13 February
Room 3
Technical
  • 1400-1420 23815
    Fit For Purpose Well Design With Dual Sized Casing Across Multiple Perforated Zones Provided Cost Efficient Completion And Intervention Options.
    A. Muhammed, Saudi Aramco D&WO
  • 1420-1440 23739
    Practical Implementation Of Combining Wellbore Survey Tools For Optimized Wellbore Position Accuracy
    M. Houbiers, Equinor ASA; R. Lowdon, SLB; J. Bang, A. Ledroz, Gyrodata Inc.; M. Elgizawy, K&M Technology Group
  • 1440-1500 23750
    Successful Field Trials For Tracking Casing Exit: Innovative Sensing Technology Application
    H. Gomez, H. Gamal, Weatherford Saudi Arabia; A. Alshaarawi, M. Alshalan, Saudi Aramco PE&D
  • 1500-1520 23842
    Impact Of Risk Management On Project Performance To Deliver Brownfield Fdp: Integrated Assessment, From Perspective Of The Operator.
    N. Nasrah, Expro Oilfield Services Sdn Bhd; M. Elham, Petronas Carigali Sdn Bhd; A. Naharindra, Expro Group Malaysia Sdn Bhd; M. Zahari, PCSB; M. Abdul Basik, Expro Oilfields
  • Alternate 23784
    Delivering Successful Quadlateral Wells Campaign In The Middle East; Milestones & Lessons Learned
    M. Maafri, M. Algaiar, M. Farhat, Baker Hughes Co. Saudi Arabia
  • Alternate 23766
    Erd Record In Shallow Weakly Consolidated Formation With Remarkable Efficiency
    T. Xie, X. Hou, H. Huo, H. Lin, CNOOC China Limited, TianJin Branch; State Key Laboratory Offshore Oil Exploitation CNOOC China Limi
  • Alternate 23844
    Drilling The Longest Re-entry Well In Khafji Joint Operations With Smart Fit For Basin Drilling Services
    A. Osman, A. Al Majed, M. Aldossary, Schlumberger Saudi Arabia; M. Muheeb, E. Al-Jassam, Khafji Joint Operations
  • Alternate 23744
    Deviating From The Norm: Delivering Ultra Deepwater Exploration Well With Mpd System, Utilizing Statically Underbalance Mud Weight
    S. Shathiskumar, PETRONAS Carigali
  • Alternate 23811
    Design And Implementation Process For Dual Concentric Completion With Esp Lifting System
    A.F. Melo, Ecopetrol SA; M. Artunduaga, D. Molano, L. Guarin Ortiz, Ecopetrol
  • Alternate 23782
    Bottom Hole Pressure Data, Applications, Inference While Drilling With Severe Losses And Mudcap Drilling
    D. Muralidharan, A. Al-Khamis, Saudi Aramco; P. Chakrabarti, M. Al-Rasheed, Baker Huges
  • Alternate 23713
    Method And Apparatus For Deploying And Cementing Liners Across Challenging Well Profiles
    A. Alotaibi, Saudi Aramco D&WO

Our Sponsors