IPTC LogoPTTEP

1–3 March 2023
Bangkok, Thailand

IPTC Programme Schedule

Subpage Hero

Loading

TS21 Technical Session 21: Challenges in Well Completion

Thursday, 2 March
Lotus Suite 11
Technical Session
Chairperson
Kyle Kimmitt - Shell QGC Pty Ltd
David Zhan - Saudi Aramco
  • 1400-1430 22881
    Lang Lebah Carbonate Gas Development: Comprehensive Review of the Challenges of a HPHT Completion Design with High H2S and CO2
    G. Grant, G. Ong, W. Toempromaraj, K.W. Wejwittayaklung, P. Bandyopadhyay, PTTEP; D.B. Lewis, Blade Energy Partners; K. Abdul Rashid, P. Konganuntragul, P. Jantasuwanna, PTTEP
  • 1430-1500 22882
    Advancement of Open Hole Gravel Pack and Zonal Isolation with Selective Intelligent Completion in Deepwater Malaysia
    E. Samuel, N. Nopsiri, PTTEP Sarawak Oil Ltd.; N. Moses, D. Yi, A. Jayadi, Schlumberger; A.A. Ahmad Nordin, Schlumberger WTA Malaysia Sdn. Bhd.; M. Teoh Chia Mei, Schlumberger
  • 1500-1530 22851
    Innovative Approach to Enhanced Well Integrity Evaluation in Unconventional Completions with Fiberglass Casings
    K. Singh, Schlumberger; F.R. Waluyo, A.A. Hijles, Saudi Aramco; A. Benslimani, Schlumberger
  • Alternate 22860
    Horizontal Lateral Drilling and Completion with Openhole Gravel Pack through a Unique TAML Level-4 Multilateral Junction System: The Installation Case Study from South China Sea
    H. Lei, Y. He, CNOOC China Ltd., Shenzhen Branch; L. Zhang, K. Revheim, M. Shafiq, H.M. Hamdi, Y. Huo, G. Zhao, Schlumberger
  • Alternate 22868
    Removing the Requirement for De-burr Runs on a Field Development Multizones Well Completion
    K.I. Jamieson, Welltec; S.M. Ibitomihi, Brunei Shell Petroleum Sdn. Bhd.; P. Hazel, Welltec Inc; M.K. Kolakalapudi, Shell India Markets Private Ltd; J. Cayao, J. Cayao, Welltec; S.J. Thomson, Shell Prospectg/Devel. Peru
  • Alternate 22871
    Holistic Approach Recipe for a Successful Deployment of ICD Lower Completion Achieving 35% Time Optimisation for LSTK Projects in the Middle East
    M.H. Almuallim, Schlumberger Middle East SA
  • Alternate 22875
    Results and Lessons Learned from Pilot Installation Programme of Erosion Resistant Ceramic-coated Wire Wrapped Screens in Offshore Malaysia
    M.B. Mustafa, Neural Oilfield Service Sdn. Bhd.; W. Yeap, PETRONAS Carigali Sdn. Bhd.

Sponsoring Societies

AAPG

 

EAGE

 

SEG

 

SPE