IPTC LogoPTTEP

1–3 March 2023
Bangkok, Thailand

IPTC Programme Schedule

Subpage Hero

Loading

TS44 Technical Session 44: Well Integrity and Production Monitoring

Friday, 3 March
Lotus Suite 10
Technical Session
Chairperson
Md Mofazzal Hossain - Curtin U.
Fatemeh Mehran - Halliburton
  • 1400-1430 22992
    Restoration of High-temperature Well Integrity via Real-time Coiled Tubing Patch Application
    S. Karpaya, S.M. James Berok, J. Barat, B. John Peter, A. Utta, H. A Rahman, PETRONAS Carigali Sdn Bhd
  • 1430-1500 23014
    Research and Application of the Comprehensive Corrosion Prevention Technology for Offshore Thermal Wells in Bohai Oilfield
    X. Han, China U. of Petroleum, Beijing
  • 1500-1530 23044
    Development of Fast Multiphase Wellbore Simulator for Virtual Flow Metering and Production Optimisation
    A. Gryzlov, Aramco Innovations; M. Arsalan, Saudi Aramco; S. Safonov, Aramco Innovations; B. Krasnopolsky, Inst. of Mechanics MSU
  • Alternate 23051
    Integrated Measurement and Control Technology for Intelligent Artificial Lift Based on Multiphase Flowmeter
    G. Chen, F. Deng, S. Chen, RIPED, PetroChina
  • Alternate 22997
    Non-conventional Engineering Approaches to Effectively Shut Off Highly Deviated Gas Producer Wells in One of the World Oldest Gas Producers: Myanmar Experiences
    P. Venugopalan, W. Safwan, PETRONAS Carigali Sdn. Bhd.; Y. Min Htun, PETRONAS Carigali Myanmar Ltd.; H.A. Winn, PC Myanmar (HK) Ltd.; S.B. Abdul Ghani, F. Yahaya, S. Sy M Shahril, K. Kamal, PETRONAS Carigali Sdn. Bhd.; K. Singh, Schlumberger WTA Malaysia Sdn. Bhd.; N. Yong, Dowell Schlumberger; K. San Wong, S. Kalidas, Schlumberger WTA Malaysia Sdn. Bhd.
  • Alternate 23036
    Holistic Performance Review of Through-Tubing Sand Screen as Remedial Sand Control: Best Practices and Lessons Learnt from Past Installations in Offshore East Malaysia Oil Fields
    C.Y. Tang, PETRONAS Carigali Sdn. Bhd.
  • Alternate 22996
    Complex Offshore Well Intervention Now Possible by Using Thru-tubing Bridge Plug to Produce By-pass Zone and Isolate Lower Production Zone
    A.S. Eyuboglu, E. Siregar, W. Destrina, B. Andhika, F. Murvianto, Halliburton; Z. Yuliarosa, P. Siahaan, Medco Energi
  • Alternate 23000
    Water Cut Estimation Using ESP Sensor Reading and Well Test Data: A Novel Approach
    B.A. Sumarto, F.A. Al-Shareeda, B.H. Nugroho, H.J. Al-Aradi, B.H. Akbar, M.A. Joenaedy, Kuwait Oil Co.; P. Achmad, Schlumberger
  • Alternate 23020
    Evaluation of Erosion Resistant Ceramic Coated through Tubing Sand Screen Installation in Peninsular Malaysia
    S.I. KAMAL, Z. M Zin, N. Kamarul Zaman, M. A Rahim, PETRONAS Carigali Sdn. Bhd.; N. Ayub, PETRONAS; F. Hasnol Zam Zam, PETRONAS Carigali Sdn. Bhd.
  • Alternate 23058
    Increasing Run Life by Using Multiple Preventive Downhole Pump (MPDT) to Overcome Gas Interference and Sand Problem on Sucker Rod Pump Well
    R.W. Suryantoro, PT Pertamina EP; D. Dewanata, PT Pertamina EP PMT EOR Rantau; Y. Oktoviyanto, L. Arif, PT Pertamina EP

Sponsoring Societies

AAPG

 

EAGE

 

SEG

 

SPE